top of page

START-UP AND COMMISSIONING

Hart Consults can provide experienced assistance with the start-up of equipment and systems during the final stages of construction for your drinking water and wastewater projects.  Verification paperwork and documentation provided and organized based on your project specific specifications giving you a paper trail to ensure the proper installation and commissioning of equipment and systems giving you peace of mind and reliability of your installation.

  • Construction Observation

  • Equipment Installation

  • Start-up and Field Testing Verification

    • Bump Test

    • Manufacturer Installation and Start-up Verification

    • Tags/Certificates

    • Pump Balancing and Vibration Analysis

    • Pump Efficiency Calculation

    • VFD Balancing

    • I/O Check

    • Instrumentation Functionality

    • SCADA Functionality

  • Final Commissioning Verification

  • Manufacturer Training Witnessing

  • Documentation of Required Certificates

Additional information on Commissioning for the Water Industry may be found in the following presentation given by Carina at the Connecticut Chapter of American Water Works (CTAWWA) Annual Technical Conference and Vendor Exhibition (ATCAVE) conference. 

bottom of page